These Terms of Installation establish the responsibilities, site conditions, material considerations, and service limitations that apply when Nova Stones provides templating, fabrication, delivery, or installation services.

They supplement the accepted estimate, order confirmation, drawings, selections, change orders, and any other written agreement for the project. Project-specific written terms control if they directly conflict with this document.

Part I. –Scope and acceptance

These terms apply to residential and commercial countertop-related services performed or coordinated by Nova Stones, including field measurement, digital or physical templating, material review, fabrication, delivery, and installation.

The client accepts these terms by approving an estimate or order, authorizing templating or fabrication, scheduling delivery or installation, making payment, or permitting work to proceed at the project site.

Important

The Pre-Installation Guide is a practical preparation resource. These Terms of Installation govern the service relationship if the guide and these terms address the same subject differently.

Part II. –Estimates, orders, and changes

Preliminary information

Estimates may be based on drawings, client-provided dimensions, photographs, plans, product selections, or other preliminary information. Pricing and scope remain subject to verification during material review and final templating.

Final scope

Final quantities, dimensions, edge details, cutouts, seams, support requirements, access conditions, and other fabrication details are determined from the approved project information and the final template. Material yield may require more slab area than the visible finished square footage.

Changes

Changes requested after approval may affect price, material availability, fabrication, seam placement, and schedule. Changes made after templating may require a new template. Changes made after fabrication begins may be unavailable or may require replacement material and additional charges.

Part III. –Site and access requirements

Client responsibility

The client must provide safe, legal, and reasonably unobstructed access to the project site for personnel, vehicles, tools, material, and lifting equipment. Driveways, entrances, hallways, elevators, stairs, and work areas must be clear and capable of accommodating the material and installation process.

  • An authorized adult must be available when project decisions or approvals may be required.
  • Parking, loading, elevator reservations, building permissions, security access, and similar arrangements must be completed before arrival.
  • Children, pets, occupants, and unrelated trades must remain clear of the active work area.
  • Fragile, valuable, or sensitive items must be removed or protected before work begins.
Service exclusion

Unless specifically included in writing, Nova Stones does not move household contents, disconnect security systems, remove doors or windows, provide traffic control, or modify the building solely to create delivery access.

Part IV. –Cabinets and structural support

Client responsibility

Cabinets, pony walls, supports, panels, framing, and substrate must be fully installed, level, plumb, secured, structurally sound, and in their permanent positions before templating. The layout must not be altered after templating without written coordination and approval.

The client and the client’s cabinet or construction professionals are responsible for verifying that the structure can support the selected material, overhangs, appliances, sinks, fixtures, and concentrated loads. Additional brackets, steel, plywood, blocking, or other support must be installed before the countertop when required by the approved design or site conditions.

Installation condition

Nova Stones may postpone templating or installation when cabinets or supports are incomplete, unstable, out of level, inaccessible, or inconsistent with the approved project information.

Part V. –Templating and final measurements

Templating establishes the fabrication dimensions and records relevant walls, cabinets, supports, sinks, appliances, fixtures, overhangs, edges, cutouts, and site conditions. Client-provided measurements are for planning or preliminary pricing unless Nova Stones expressly agrees otherwise in writing.

Client responsibility

All items affecting the countertop must be present, accessible, final, and approved at templating. This includes sinks, faucets, cooktops, ranges, appliances, accessories, manufacturer templates, installation instructions, and finished cabinet panels.

The client or authorized representative must review and approve material choices, edge profiles, overhangs, backsplash details, sink reveal, cutouts, seam planning, and other decisions requested during the templating process.

Cabinets, walls, appliances, and fixtures must not be moved, replaced, or altered after templating. Any such change must be reported immediately and may require re-templating, revised fabrication, replacement material, schedule changes, and additional charges.

Part VI. –Natural material characteristics

Color, shade, pattern, veining, movement, translucency, mineral deposits, fossils, pores, pits, fissures, resin fills, mesh backing, surface texture, thickness, and reflective quality can vary within one slab and between slabs or samples.

Samples, photographs, digital renderings, configurators, and showroom displays represent general appearance only. Lighting, screen settings, finishing, slab orientation, and fabrication can affect the final appearance.

Where slab review is offered or required, the client is responsible for timely approval. Nova Stones may determine final layout, orientation, and placement in a manner intended to balance approved design priorities, structural considerations, usable slab area, and fabrication requirements.

Natural material notice

Natural stone is created by geological processes and is not uniform or manufactured to an identical pattern. Variation is part of the material’s identity and may remain visible after fabrication and installation.

Part VII. –Fabrication, seams, and tolerances

Nova Stones selects fabrication methods appropriate to the material, finish, dimensions, equipment, transportation, access, and installation conditions. Fabrication may include reinforcement, rodding, mesh, resin, fills, lamination, mitering, polishing, hand finishing, or other customary processes.

Seams

Seams may be required because of slab dimensions, material strength, pattern, access, weight, transportation, installation sequence, cabinet layout, cutouts, or safety. Seam location and number may be revised when actual material or site conditions require it. Seams remain visible and may vary in width, height, color, texture, pattern alignment, and adhesive appearance.

Walls and field conditions

Buildings, walls, cabinets, floors, and openings are rarely perfectly straight, square, level, or plumb. Reasonable gaps may be necessary for fitting and movement. Caulk, trim, backsplash, drywall work, or other finishing methods may be needed to address irregular conditions.

Edges, cutouts, and finishes

Hand-finished transitions, inside corners, cutouts, edge profiles, laminations, and field modifications can show minor variations. Factory, quarry, and field finishes may reflect light differently even when intended to coordinate.

Part VIII. –Delivery and installation

Installation may involve heavy material, adhesives, sealants, cutting, grinding, drilling, shimming, fastening, and other construction activity. Reasonable noise, vibration, dust, odor, and temporary disruption may occur despite protective measures and ordinary care.

Nova Stones responsibility

Nova Stones will use reasonable care in handling and installing the fabricated material and will maintain an orderly work area consistent with the service being performed. Protective measures are intended to reduce risk but cannot eliminate every possibility of incidental dust, vibration, contact, or disruption.

Client responsibility

The client must protect adjacent finishes and disclose concealed or sensitive conditions, including radiant heat, wiring, plumbing, waterproofing, glass, specialty cabinetry, historic finishes, weak substrates, or other conditions that could be affected by normal installation activity.

Minor wall contact, paint disturbance, caulk separation, drywall chipping, or trim adjustment can occur when fitting rigid material against existing construction. Unless included in writing, painting, patching, trim work, tile repair, cabinet adjustment, and similar finish work are excluded.

Part IX. –Plumbing, electrical, gas, and appliances

The client is responsible for coordinating qualified professionals to disconnect and reconnect sinks, faucets, disposals, dishwashers, cooktops, ranges, gas lines, outlets, and other systems as needed. Connections should not be made until adhesives and sealants have cured as directed.

Nova Stones is not responsible for the condition, compatibility, performance, or code compliance of client-supplied fixtures, appliances, cabinets, or third-party work. Cutouts are based on available specifications and physical items provided at the required time.

Third-party service

Unless expressly included in the written project scope, Nova Stones does not disconnect, reconnect, modify, test, or certify plumbing, electrical, gas, ventilation, fire suppression, appliances, or other regulated building systems.

Part X. –Scheduling, delays, and additional charges

Dates and time windows are good-faith estimates rather than guarantees unless a written agreement expressly states otherwise. Scheduling may be affected by material availability, slab approval, fabrication, weather, shipping, access, site readiness, equipment, personnel, inspections, building restrictions, or circumstances outside reasonable control.

Nova Stones may reschedule or suspend work when conditions are unsafe, inaccessible, incomplete, inconsistent with approved information, or likely to damage the material or property. The client must notify Nova Stones promptly of construction delays or site changes.

Additional charges

Additional charges may apply for re-templating, return trips, waiting time, failed access, storage, special handling, stairs, cranes or lifting equipment, after-hours work, layout changes, remakes caused by post-template changes, concealed conditions, or work outside the accepted scope. Charges will be communicated when reasonably practicable before the additional work proceeds.

Part XI. –Inspection, acceptance, warranty, and claims

The client or authorized representative should inspect the completed work promptly and identify visible concerns before the installation team leaves when reasonably possible. Completion or use of the installed surfaces does not waive rights that cannot legally be waived, but prompt notice helps preserve evidence and allows an efficient review.

Claims must describe the concern and include reasonable supporting information such as photographs, dates, and project details. The client must provide Nova Stones a reasonable opportunity to inspect and, where appropriate, propose correction before another party alters or repairs the disputed work.

Any written Nova Stones workmanship warranty applies according to its stated scope, duration, exclusions, and remedies. Manufacturer, quarry, supplier, fixture, appliance, sealer, and third-party warranties are separate. Natural variation, ordinary wear, misuse, impact, heat, chemicals, staining, movement, inadequate support, building settlement, moisture, third-party work, and unauthorized modification may be outside workmanship warranty coverage.

Part XII. –Payment, cancellation, and contact

Payment amounts, deposits, milestones, due dates, cancellation terms, storage fees, and refund eligibility are governed by the accepted estimate, invoice, order, or other written project agreement. Fabrication, ordering, reservation of material, and scheduling may depend on receipt of required payments and approvals.

Custom-cut, fabricated, altered, reserved, or specially ordered material may not be returnable or refundable after the applicable commitment point. Cancellation or postponement may result in charges for completed work, committed material, supplier costs, storage, transportation, and other project expenses.

Nova Stones Client Care

Email: support@novastones.com

Online request: Contact Nova Stones

CONTACT AN ADVISOR

Nova Stones Client Care is available Monday to Sunday, 7 AM to 12 AM ET, to answer all your questions.

Please email us, call 1.612.615.1542 or live chat with a Nova Stones Advisor.

GET SAMPLES

Discover the tone, texture, and finish of each material in person for your next project.

Start order

NEWSLETTER

Subscribe to receive the latest news from Nova Stones.

Nova Stones Client Care is available Monday to Sunday, 7 AM to 12 AM ET, to answer all your questions.

Please email us, call 1.612.615.1542 or live chat with a Nova Stones Advisor.

Discover the tone, texture, and finish of each material in person for your next project.

Start order

Subscribe to receive the latest news from Nova Stones.